Reliability Analysis of the 300W GaInP/GaAs/Ge Solar Cell Array Using PCM

Goo-Hwan Shin1,http://orcid.org/0000-0002-7712-2511, Se-Jin Kwon2, Hu-Seung Lee3
1Satellite Technology Research Center, Korea Advanced Institute of Science and Technology, Daejeon 34141, Korea
2Department Aerospace Engineering, Korea Advanced Institute of Science and Technology, Daejeon 34141, Korea
3Department of Mechanical and Metallurgical Engineering Education, Chungnam National University, Daejeon 34134, Korea
Corresponding Author Tel: +82-42-350-8622, E-mail: goohshin@kaist.ac.kr

© The Korean Space Science Society. All rights reserved. This is an Open-Access article distributed under the terms of the Creative Commons Attribution Non-Commercial License (http://creativecommons.org/licenses/by-nc/3.0/) which permits unrestricted non-commercial use, distribution, and reproduction in any medium, provided the original work is properly cited.

Received: May 13, 2019; Revised: May 28, 2019; Accepted: May 28, 2019

Abstract

Spacecraft requires sufficient power in orbit to perform its mission. So as to comply with system requirements, the sufficient power should be made by a solar cell array by photovoltaic power conversion. A life time of space program depends on its mission considering parts reliability and parts grade. Based on the mission life time, power equipment might be designed to meet specifications. In outer space, solar cell array might generate the dc power by photovoltaic conversion effects and GaInP/GaAs/Ge solar cells are used in this study. Space programs that require more than five years should select parts for high reliability applications. Therefore, reliability analysis for high reliability applications should be performed to check its fulfilment of the requirements. This program should also require more five years for its mission and we performed its analysis using parts count method (PCM) for its reliability. Finally, we performed reliability analysis and obtained quantitative figures found out 99.9%. In this study, we presented the reliability analysis of the 300W GaInP/GaAs/Ge solar cell array.

Keywords: reliability analysis; parts count method; solar cell array; GaInP/GaAs/Ge; diode; temperature

1. INTRODUCTION

System level reliability and availability estimates are required to facilitate cost studies associated with competing photovoltaic systems (Collins et al. 2009). A solar cell array to be used for the ground power equipment might be also perform, and even though a solar cell array shall be estimated by analyzing its reliability prediction associated with its orbit and a life time for mission life time before launch. Normally, a solar cell array to be used in space program requires more high reliability because it will not be repaired after launch in orbit. A solar cell array consists of many electrical, electronic and electro-mechanical (EEE) parts that have higher availability than estimates. In addition, the reliability and durability are two important factors for the new photovoltaic cells and panels. The life time of photovoltaic cells such as but not only the multi-junction cells used in concentrated light whose efficiency is 46% and the very promising solar cells whose efficiency increases very quickly at 20.1% (Tudor et al. 2016). For that reason, several methods for reliability estimates was conducted in ground before launch in terms of an accelerated life time test and chamber reliability test. Spacecraft requires a sufficient power in orbit to perform its mission. So as to comply with system requirements, the sufficient power should be made by a solar cell array by photovoltaic power conversion using GaInP/GaAs/Ge solar cell array in this study. A life time of space program depends on its mission considering parts reliability and parts grade in terms of commercial parts, military-class parts and space-grade parts. Based on the mission life time, a required power might be designed and analyzed to meet specifications. In outer space, a required power might be generated using a solar cell array by photovoltaic conversion effects using GaInP/GaAs/Ge solar cells. Therefore, we conducted a reliability analysis for the 300W solar cell array considering electrical parts and environmental conditions in orbit and obtained its reliability with 99.9% based on the part count methods that considered all the parts used in the analysis.

2. 300W SOLAR CELL ARRAY

2.1 Solar Cell Array Configuration

In outer space, the solar cells are unique for generating a electrical power by photovoltaic power conversion. Photons from the Sun might be irradiated on the surface of a solar cell, and then they are converted into electricity. Therefore, a total of 352 GaInP/GaAs/Ge solar cells are needed to generate 300W electrical power. In this study, we selected a solar cell that is a size of 80㎜ × 40㎜ × 16㎛ for system configuration and design to do reliability analysis. It is fabricated by a GaInP/GaAs/Ge technology based on Ge substrate (AZUR 2018;AL-Naser1 et al. 2009;Chiang et al. 1995). Fig. 1 shows a solar cell consisted of a GaInP/GaAs/Ge technology.

jass-36-2-69_F1
Fig. 1. Solar cell and dimensions with GaInP/GaAs/Ge technology
Download Original Figure

The GaInP/GaAs/Ge solar cell has electrodes on the top side of the cell in Fig. 1 and the other one has the bottom side of the cell since that is the rear side of the GaInP/GaAs/Ge solar cell. By using those GaInP/GaAs/Ge solar cells, an electrical configuration of the 300W solar cell array consists of a total of 325 solar cells as shown in Fig. 2. In more details, there are 11 strings in this solar cell array and each string consists of 33 solar cells in a string to make a proper operating voltage such as a maximum voltage and a maximum current in the maximum power generation. In other words, a solar cell array will work at the peak power mode to increase a photovoltaic conversion power. A power controller will track a peak point of power in the V-I characteristics which shall find the maximum point along the current and voltage curves, and then the maximum power of the 300W solar cell array is generated at the operating point by some hardware characteristics.

jass-36-2-69_F2
Fig. 2. Configuration of a GaInP/GaAs/Ge solar cell array
Download Original Figure
2.2 Design of 300W Solar Cell Array

Prior to reliability analysis of the 300S solar cell array, the configuration was reviewed in the section 2.1 and a required solar cell was also occurred considering the operating point in V-I characteristics. In addition to the configuration, a detailed schematic was needed for reliability analysis. Thus, a schematic for analysis was proposed like Fig. 3 and total parts were also included in this schematic.

jass-36-2-69_F3
Fig. 3. Schematic diagram of the 300W solar cell array with strings and blocking diodes
Download Original Figure

In Fig. 3, red ones are the solar cells consisted of GaInP/GaAs/Ge technology with 11 strings and 32 cells in series and 1N5417 diodes to make isolation between adjacent circuits are designed and considered for electrically isolated power in this solar cell array. Furthermore, the outputs of the 1N5417 diodes are tied together.

3. RELIABILITY ANALYSIS OF THE 300W SOLAR CELL ARRAY

3.1 Parts List for Reliability Analysis

In this study, PCM is used for reliability analysis and PCM requires total parts used in the 300W solar cell array. Thus, total parts should be recognized by a bill of material (BOM) which includes all the parts in the 300W solar cell array. The parts used in reliability analysis are described in Table 1 and those are accompanied by analysis.

Table 1. Parts list used in the 300W solar cell array
jass-36-2-69_T1
Download Excel Table

A total of 352 solar cells are used to make a required power and those shall be accompanied by this reliability analysis. Not only diodes are used for this array, but one resistor and connector are also applied in the reliability. In addition, an interconnection between cells should be responsible for bonding and current flowing from each cell to another cell.

3.2 Reliability Prediction

A space program requires an analysis on the reliability for ensuring its mission life time, because it might be very hard to do trouble shooting in orbit after launch. Therefore, an reliability analysis should be followed in design. However, a solar cell array was not performed a reliability analysis before. Thus, in this study, an analysis of the 300W GaInP/GaAa/Ge solar cell array was conducted and obtained the results to check and review its reliability for mission life time 4 years. In this study, “MILITARY HANDBOOK ELECTRONIC RELIABILITY DESIGN HANDBOOK” was referred to reliability analysis based on PCM described in section 3.1, this hand book is approved for use by all Departments and Agencies of the Department of Defenses (DoD) (Military 1992). This handbook contains two configurations for reliability analysis in series and parallel configurations like Fig. 4 with parallel and series interconnections.

jass-36-2-69_F4
Fig. 4. Reliability block diagram: (upper) series configuration and (lower) parallel configuration for analysis
Download Original Figure

In this study, there are two configurations consisting of the 300W soalr cell array using GaInP/GaAs/Ge solar cells. Therefore, two approaches are considered in this works. And also, this hand book is for guidance only for space applications. A reliability prediction is based on the failure rate such as Mean Time Between Failure (MTBF) in 50,000 hours as well as a modeling of individual EEE solar cells shall be as following Eq. (1). In addition, reliability prediction of electronic equipment for solar cells and diodes, MIL-HDBK-217F, was referenced for this analysis as well (Military Handbook 1991).

λ p = λ b π T π S π C π Q π E
(1)

where λp is the part failure rate, λb is a base failure rate, πT is a temperature factor, πs is an electrical stress factor, πC is a failure rate of each particular component, πQ is quality factor and πE is an environmental factor.

A reliability prediction of electronic equipment for resistors, MIL-HDBK-217F, was referenced for this analysis and its equation shows like Eq. (2).

λ p = λ b π R π Q π E
(2)

where λp is the part failure rate, λb is a base failure rate, πR is a resistance factor, πQ is quality factor and πE is an environmental factor.

A reliability prediction of electronic equipment for connectors, MIL-HDBK-217F, was referenced for this analysis and its equation shows like Eq. (3).

λ p = λ b π K π P π E
(3)

where λp is the part failure rate, λb is a base failure rate, πK is a mating factor and πE is an environmental factor.

A reliability prediction of electronic equipment for wire and connectors, MIL-HDBK-217F, was referenced for this analysis and its equation shows like Eq. (4).

λ p = λ b π Q π E
(4)

where λp is the part failure rate, λb is a base failure rate, πQ is a quality factor and πE is an environmental factor.

The failure rate of the 300W solar cell array will simply be estimated by Eq. (1) to Eq. (4) and then all the reliabilities of the 300W solar cell array might be calculated by mathematical calculations using failure rates.

A total failure rate of 0.004506 was occurred and a total reliability was found about 99.960538%. It means there could be found the failure rate in 1,000,000 hours and it was very high reliability for mission operation.

4. RESULTS AND DISCUSSION

In this parts count method, we have used a total of 352 GaInP/GaAs/Ge solar cells, 11 diodes for blocking a current against strings, a resistor for a grounding path of the substrate and a connector. Those parts were accompanied by reliability analysis. Based on the parts count method, the reliability analysis was conducted shown in Table 2, which found out 99.960535% for 11 years. It means that there will be 0.03% in failure for 11 years. The 300W solar cell array requires a series connection to provide a proper operating voltage and a parallel interconnection to make a required current at peak power. So, we choose those solar cells and diode as a primary power source in orbit.

Table 2. Reliability of the 300W GaInP/GaAs/Ge solar cell array
jass-36-2-69_T2
Download Excel Table

Fig. 5 shows individual parts reliability for this study, and then we obtained that of those parts connector and wire based on guidelines had a little higher than other parts. It means that those parts should be controlled for high reliability among them. Therefore, we had a reliability of 99.9% which has a higher reliability compared to electronics used in space products. Similarly, Next Generation Small Satellite-1 (NEXTSat-1) consisted of many solar cells using GaInP/GaAs/Ge technology had been launched last year and contained operational scenario considering the reliability for mission life time (Shin et al. 2014). That program showed us its reliability and presented its performance according to reliability analysis. In addition to this reliability, some radiation effects of solar cells should be considered in system design. A radiation effects was conducted by Co60 source and obtained its degradation ratio by yearly (Shin et al. 2008;Lee JJ et al. 2008;Oh DH et al. 2018;Choi HY at al. 2015;Choi HY et al. 2015;Choi EJ et al. 2017).

jass-36-2-69_F5
Fig. 5. Parts failure rate used in the 300W solar cell array
Download Original Figure

5. CONCLUSIONS

Spacecraft requires a sufficient power in orbit to perform its mission. So as to comply with system requirements, the sufficient power should be made by a solar cell array by photovoltaic power conversion using GaInP/GaAs/Ge solar cell array in this study. A life time of space program depends on its mission considering parts reliability and parts grade. Based on the mission life time, a required power might be designed and analyzed to meet specifications. In outer space, a required power might be generated by solar cell array by photovoltaic conversion effects using GaInP/GaAs/Ge solar cells. Space programs that require more than five years should choose parts for high reliability for ensuring its mission. Therefore, Space program required more five years should perform a reliability analysis to check its fulfilment of the requirements. This program should also require more five years for its mission and we performed its analysis using parts count method (PCM) for its reliability. Finally, we obtained its reliability analysis and quantitative figures found out 99.9%. In reliability analysis, important variables were recognized by the following individual parameters of the parts, Table 3.

Table 3. Major reliability variables for analysis to provide a proper life time considering parts frage
jass-36-2-69_T3
Download Excel Table

From Table 3, a reliability analysis for ensuring its life time shall be referred to those variables and they should be dependable orbit conditions such as radiation effects and thermal effects. Thus, environmental conditions should be reflected on the reliability analysis. Therefore, we presented the reliability analysis of the 300W GaInP/GaAs/Ge solar cell array considering the radiation and on-orbit thermal effects as well. By using those results, a prediction of the 300W solar cell array was presented.

ACKNOWLEDGMENTS

This work was supported by the program (Grant No. 2017M1A3A3A03016516) of the Design and Analysis of Spacecraft Solar Array Panel for LEO Mission funded by the Ministry of Science and ICT (MSIT) of the Republic of Korea.

References

1.

AL-NaserQAH, Hilou HW, Abdulkader AF, The last development in III-V multi-junction solar cells, in 2009 ISECS International Colloquium on Computing, Communication,, Control, and Management, Sanya, 8-9 Aug2009, 373-378.

2.

AZUR SPACE GMBH, 0% Triple Junction GaAs Solar Cell, AZUR Data Sheet, (2018), 1-2.

3.

Chiang PK, Krut D, Cavicchi BT,The progress of large area GaInP2/GaAs/Ge triple junction cell development at Spectrolab, Proceedings of the 14th Space Photovoltaic Research and Technology Conference, Cleveland, OH, 1 Oct1995, 47-56.

4.

Choi EJ, Cho SK, Jo JH, Park JH, Chung TJ, et al., Performance analysis of sensor systems for space situational awareness, JASS34, 303-313 (2017).

5.

Choi HY, Kim HD, Seong JD,Analysis of orbital lifetime prediction parameters in preparation for post-mission disposal, J. Astron. Space Sci.32, 367-377 (2015).

6.

Collins E, Dvorack M, Mahn J, Mundt M, Quintana M,reliability and availability analysis of a fielded photovoltaic system, in 2009 34th IEEE Photovoltaic Specialists Conference (PVSC), Philadelphia, PA, 7-12 June2009, 1-6.

7.

Cotfas DT, Cotfas PA, Floroian DI, Floroian L,Accelerated life test for photovoltaic cells using concentrated light, Int. J. Photoenergy. 2016., 9825683 (2016).

8.

Lee JJ, Kwak YS, Hwang JA, Bong SC, ChoKs, et al., Space radiation effect on si solar cells, J. Astron. Space. Sci.25, 435-444 (2008).

9.

Military Handbook,Reliability Prediction of Electronic Equipment, 1-50 (1991).

10.

Oh DH, Kim JY, Lee HS, Jang KI,Satellite-based in-situ monitoring of space weather: KSEM mission and data application, J. Astron. Space Sci.35, 175-183 (2018).

11.

Shin GH, Chae JS, Lee SH, Min KW, Sohn J, et al., Operational concept of the NEXTSat-1 for science mission and space core technology verification, J. Astron. Space Sci.31, 67-72 (2014).

12.

Shin GH, Ryu KS, Kim HM, Min KW, Radiation effect test for single-crystalline and polycrystalline silicon solar cells, J. Korean Phys. Soc.52, 483-487 (2008).